Ellistat helps you install the SPC module

The installation of our SPC module requires different stages to be followed, and it is compulsory to present the deliverables from one stage to the next. 

You can work independently or be supported by our team.

Stage 1
Diagnosis

Before implementing an SPC, it is essential to understand the production process as a whole. Assess the feasibility of SPC.

The diagnosis allows:

  • define the project team
  • draw up a realistic project schedule
  • prepare the installation of Ellistat and the connection of the measuring instruments
  • prioritise the stages and prepare the training plan

Our support : 1 day on-site diagnosis

Deliverables :

  • SPC project Gantt
  • Completed project charter

Step 2
Creating standards

Setting up the software and training administrators in the use of Ellistat SPC :

  • Website creation
  • Creating inspection plans
  • Creating custom fields
  • Setting contexts and alerts
  • Connecting measuring instruments
  • Determining the frequency and quantity of parts.
  • Batch management with Ellistat SPC.
  • Creating dashboards
  • ...

Our support : between 2 and 5 days on-site installation time

Deliverables :

  • Configured SPC software
  • Range creation standard
  • Control standard
  • Connected measuring instruments

Step 3
Data transfer

Automated import of customer data into Ellistat.

Our support : on quotation

Deliverables :

  • Ranges imported into Ellistat

Step 4
User training

Reminder of the basic concepts of SPC.

  • Application on a machining simulator.

Understanding the concepts :

  • Process variability, common causes, special causes, capabilities, defining sampling size, sampling frequency and control rules.

Using Ellistat software

Our support :

  • User training: 1 day
  • Key User training: 2 days

Step 5
Going into production
  • Adapting the SPC Ellistat settings to the realities of the field.
  • Technical Q/A
  • Using capability indicators.
  • Adapt sampling frequency and size.
  • Setting up field routines

Our support :

  • 1 day/month for 6 months

Support
SPC

Before implementing an SPC, it is essential to understand the production process as a whole. Assess the feasibility of SPC.

The diagnosis allows:

  • define the project team
  • draw up a realistic project schedule
  • prepare the installation of Ellistat and the connection of the measuring instruments
  • prioritise the stages and prepare the training plan

Our support : 1 day on-site diagnosis

Deliverables :

  • SPC project Gantt
  • Completed project charter

Setting up the software and training administrators in the use of Ellistat SPC :

  • Website creation
  • Creating inspection plans
  • Creating custom fields
  • Setting contexts and alerts
  • Connecting measuring instruments
  • Determining the frequency and quantity of parts.
  • Batch management with Ellistat SPC.
  • Creating dashboards
  • ...

Our support : between 2 and 5 days on-site installation time

Deliverables :

  • Configured SPC software
  • Range creation standard
  • Control standard
  • Connected measuring instruments

Automated import of customer data into Ellistat.

Our support : on quotation

Deliverables :

  • Ranges imported into Ellistat

Reminder of the basic concepts of SPC.

  • Application on a machining simulator.

Understanding the concepts :

  • Process variability, common causes, special causes, capabilities, defining sampling size, sampling frequency and control rules.

Using Ellistat software

Our support :

  • User training: 1 day
  • Key User training: 2 days

  • Adapting the SPC Ellistat settings to the realities of the field.
  • Technical Q/A
  • Using capability indicators.
  • Adapt sampling frequency and size.
  • Setting up field routines

Our support :

  • 1 day/month for 6 months