If the main contrast is found to be product to product, the investigation should be continued in order to discover what created the contrast.
The inversion test is often the ideal tool for this. The inversion test functions in the following way: We have one good and one bad product.
The goal is to invert the components of the good and bad products in order to identify which component created this contrast.
The inversion test functions if:
  • We have one good product A and one bad product B
  • We can measure the result to be optimized
  • We are able to take the system apart and put it back together
  • We have a certain number of suspicious components
The inversion test is carried out as follows:
  1. Isolate the extremes: Measure a batch of products and isolate the two products farthest from each other (in measurements). Choose the best of the best (BOB) and the worst of the worst (WOW)
  2. Identify variability: Assemble and disassemble the BOB and WOW three times to find the variability in the assembly disassembly process. Once this has been performed you will have the assembly/disassembly limits:
Test inversion1
The red and green limits are the variability zones of assembly/disassembly. This means that, while assembling/disassembling the product, its value can naturally be found inside this zone.
If the measurement value is not inside this zone after replacing a component, this means that this component is the variable having a significant effect on the measurement. It becomes a suspicious component.
  1. Maker sure that the problem truly originates from this component:
  2. The distance D must be more than 1.25
  3. Replace all the components and verify that the inversion exists
  4. Replacing the components: Replace the components one by one and identify the component or components that created the inversion

Example 1:

Component D caused the inversion, it is the main suspect
Test inversion3

Example 2:

Components A and B are both responsible for the defect, therefore a hat test must be carried out at the end of the inversion to support this hypothesis
Test inversion4

Una soluzione completa per l'Industria 4.0

8 moduli statistici

trial

Test

0

30 giorni

Testalo gratuitamente

APC

SPC

Controllo

Analisi

check

30 giorni

check

Tutte le funzioni di Ellistat

check

1 utente

Supporto tecnico e ed aggiornamenti inclusi

student

Studente / Insegnante

0

1 anno

Checkout

Analisi

check

1 anno

check

Tutte le funzioni di Ellistat

check

1 utente

check

Licenza dedicata agli studenti che dispongono di una tessera studente in corso di validità

Supporto tecnico e ed aggiornamenti inclusi

standard

Standard

49

per utente al mese

Checkout

Analisi

check

Licenza rinnovata ogni mese

check

Tutte le funzioni di Ellistat

check

Utenti illimitati

check

Supporto tecnico e ed aggiornamenti inclusi