Descriptive statistics
Statistical tests
Design of Experiment
Gage RR
Problem resolution
Reliability
Control plan
User's Guide Menu

User Guide

Control plan

The "Control plan" module helps you decide whether you will accept a batch according to that batch's samplings. Several types of samplings are taken into account:
  • Control by attribute (single, double, or progressive plans)
  • Control by measurement (method S, s, progressive).
With the exclusive Ellistat module you can not only calculate standardized plans but you can also create customized plans that are often much more adaptable than standardized plans. It is also possible to carry out reception controls with any method, even the most innovative progressive measurement reception control methods. This method, with its persistent efficiency, makes it possible to considerably reduce sample size.

A complete solution for Industry 4.0

8 Statistical Modules

trial

Trial

0

1 month

Try it for free

Analysis

check

1 month

check

All feature's of Ellistat's Analysis Module.

check

1 user

Technical support and updates included.

student-teacher

Student / Teacher

0

1 year

Checkout

Analysis

check

1 year

check

All feature's of Ellistat's Analysis Module.

check

1 user

check

Dedicated student licence upon presenting a valud student card.

Technical support and updates included.

standard

Standard

79

per user per month

Checkout

Analysis

check

Automatic monthly renewal

check

All feature's of Ellistat's Analysis Module.

check

Unlimited users.

check

Technical support and updates included.