Descriptive statistics
Statistical tests
Design of Experiment
Gage RR
Problem resolution
Reliability
Control plan
Benutzerhandbuch Menü

Benutzerhandbuch

Calculating the Cp, Pp and Ppk

As we have just seen, Cp and Pp are calculated based on the same formula. What differentiates them is the time period for which variability is calculated. There are several methods of calculating Cp and Pp.

Method 1: By taking several samples at regular intervals

The first method for calculating short term and long term variability is to take several samples at regular intervals.
Illustration
  • Short-term variability: short term variability is calculate by using the intra-series standard deviation calculation for the entirety of the samplings
  • Long term variability: we take a sample of 50 parts over a period characteristic of the process to take into account multiple variation sources of the process such as adjustments, tool replacement, material, etc...The long term variability is calculated by::

Example: We take the following samples

Illustration 2
The tolerance interval is [1;10].
The intra-series standard deviation is calculated:
The standard deviation for all the parts is calculated:
We therefore deduce:

Method 2: By taking two distinct samplings

The second short term and long term variability calculation method is made by taking two distinct samplings.
  • • Short term variability: 50 consecutive parts are taken out without adjustment so that the process' short term variability can be calculated. Short-term variability is calculated by:
  • • Long term variability: 50 pieces are taken out distributed over a period characteristic of the process in order to take into account multiple process variation sources such as adjustments, tool replacements, material, etc...The long term variability is calculated by

Example: The two following samplings are taken:

2 prélevements
The tolerance interval is [1; 10]

Short-term:

The intra-series standard deviation is therefore calculated as:
Therefore:

Long-term :

The standard deviation of the entirety of the parts is therefore calculated:
Consequently:
Long terme 34

Eine Komplettlösung für Industrie 4.0

8 statistische Module

trial

Versuch

0

30 Tage

Testen Sie es kostenlos

Analyse

check

30 Tage

check

Alle Funktionen von Ellistat

check

1 Benutzer

Technische Unterstützung und Wartung inbegriffen

student-teacher

Studenten / Lehrer

0

1 Jahr

Zur Kasse

Analyse

check

1 Jahr

check

Alle Funktionen von Ellistat

check

1 Benutzer

check

Lizenz für Studenten, die über einen gültigen Studentenausweis verfügen

Technische Unterstützung und Wartung inbegriffen

standard

Standard

79

pro Benutzer pro Monat

Zur Kasse

Analyse

check

Lizenz wird alle zwei Monate erneuert

check

Alle Funktionen von Ellistat

check

Unbegrenzter Benutzer

check

Technische Unterstützung und Wartung inbegriffen